Snapshot
CA High Speed Rail
Paula Wallis reports for TunnelTalk
Location
700 miles from San Francisco and Sacrameto in Northern California to Los Angeles and San Diego in the South.
Tunnels
30 to 50 miles of tunnels on starter line from San Francisco to Los Angeles and Anahiem.
Cost
Estimated $30 to $40 billion
Funding
PPP with $9.95 billion public bond
Next
Pass bond measure on November, 2008 ballot
Archive