Snapshot
ITACET Foundation - Established 2009
Council of Foundation
Abdullah Al-Mogbel (Saudi Arabia), President
Piergiorgio Grasso (Geodata, Italy), Vice-President
Felix Amberg (CUC, Switzerland), Secretary
Martin Herrenknecht (Herrenknecht GmbH)
In-Mo Lee (ITA-AITES President, South Korea)
Sherif Wissa Agaiby (Dar Al-Handasah, Egypt)
Executive Board
André Assis (Brazil), Chairman
Claude Bérenguier (France), Executive Director
Daniele Peila (Italy), Technical Director
Executive Secretary and Treasurer
Sessions have been held in Saudi Arabia, Abu Dhabi, Russia, Argentina and Thailand.
2011 training sessions include:
Kuala Lumpur, Malaysia - Design for Tunnelling
India - Health & Safety
Bahrain - Utility Tunnel Design with others planned in Singapore, Brazil and Peru.
Two-day short course ITA WTC Helsinki - May, 2011
ITACET
Abdullah Al-Mogbel (Saudi Arabia), President
Piergiorgio Grasso (Geodata, Italy), Vice-President
Felix Amberg (CUC, Switzerland), Secretary
Martin Herrenknecht (Herrenknecht GmbH)
In-Mo Lee (ITA-AITES President, South Korea)
Sherif Wissa Agaiby (Dar Al-Handasah, Egypt)
Executive Board
André Assis (Brazil), Chairman
Claude Bérenguier (France), Executive Director
Daniele Peila (Italy), Technical Director
Executive Secretary and Treasurer
Sessions have been held in Saudi Arabia, Abu Dhabi, Russia, Argentina and Thailand.
2011 training sessions include:
Kuala Lumpur, Malaysia - Design for Tunnelling
India - Health & Safety
Bahrain - Utility Tunnel Design with others planned in Singapore, Brazil and Peru.
Two-day short course ITA WTC Helsinki - May, 2011
ITACET




























