NEW PRODUCTS and INNOVATIONS
Shotcrete robot joins Normet range
Nov 2011
Normet News Release
- Normet, the mining and tunnelling equipment and chemicals company, unveiled its new Alpha series shotcrete robot, the Semmco Alpha 30, at the 29th Mining Convention in Acapulco, Mexico.
-
Semmco Alpha 30 designed for maneuverability
- The Semmco Alpha 30 is a diesel hydraulic mobile unit designed for tunnel profiles up to 7m high and 9m wide. The unit's new NSP 30 concrete pump has a maximum pumping capacity of 30m3/h. The accelerator dosing system, which has a 550-litre accelerator volume, is designed for a variety of modern accelerators. The spraying operation is controlled with a radio or wired remote control.
- Marcelo Anabalon, Chief Operating Officer of Normet (Chile) said: "The new Semmco Alpha 30 is designed with emphasis on environmental and safety issues. Its four wheel drive and four wheel steering make for easier manoeuvreing in narrow tunnels."
- The Alpha 30 is now available for customer orders with earliest deliveries available in January 2012.
|
|
