• ALERT!
    Are you signed up to our free weekly Alert email?
    Take a moment to check and stay on top of the
    tunnelling world's news and views
NEW PRODUCTS and INNOVATIONS Hydrodemolition duo Oct 2011
Aquajet News Release
Improved automatic and manual features are offered by two new models of concrete-removal robots from Swedish hydrodemolition equipment specialist Aquajet Systems.
Designed primarily for working on tunnels, bridges, roads, walls and roofs, the robots can handle concrete removal to depths of about 1000mm.
  • 360° rotation offered by the 710A

    360° rotation offered by the 710A

  • Horizontal or vertical Aqua Cutter 710H

    Horizontal or vertical Aqua Cutter 710H

The 710A features an articulated arm that can be positioned through 360° and has two telescopic joints to reach a maximum height of 3m. The 710H is designed for horizontal deck operations but can be upgraded for vertical applications.
Both new models supplement the 710V model, introduced to market earlier this year, and which is able to reach heights of up to 7m. All versions come in either Classic manual or the fully computerised Evolution versions, and feature a 2m cutting face which can be upgraded to 4m. All can be powered by diesel or by a hybrid-drive.
References
High pressure refurbishment - TunnelTalk, Aug 2010

           

Add your comment

In case of an error submitting Feedback, copy and send the text to Feedback@TunnelTalk.com
Name :

Date :

Email :

Phone No :

   Security Image Refresh
Enter the security code :
No spaces, case-sensitive
 
 
characters