Not displaying correctly? View in your browser
Click on the logos to visit the websites
DSI
Robbins
Tacs
NFM
Datwyler
BASF
Geodata
www.TunnelTalk.com keeping you informed
New Editorial Content
- ITA 2018 Award winners announced
- Malaysia examines Asian developments
- Chinese drill bits making the grade
- USA: Bid results for LA effluent outfall project
- Argentina: TBM heading to Buenos Aires Agua Sur
- Singapore: Tight squeeze for drainage drives
- Qatar: First Chinese EPBM heads to Doha
- Career Moves: Crossrail, Technymon and PJA
Diary Dates
- 27-30 Nov: bauma China trade fair, Shanghai
- 11-14 Dec: bauma CONEXPO India; Delhi
- 8-14 Apr: bauma Munich trade fair, Germany
- 3-9 May: world tunnel congress, Italy
News from the world media services
- Final breakthrough at Quito Metro
Challenges of working at high altitude
Challenges of working at high altitude
Join the Alert Forward to Colleagues
From the Editor's Desk - 08 Nov 2018
Excavating super-long tunnels at great depth and at high altitudes present particular challenges that were discussed at the Malaysian symposium and by ITA Award finalists. How to balance the need to rise to these challenges with assurances of success?
Send us your views.
From us, to you, to them - Direct by Design
Alert Delist Advertising Information
Click on the logos to visit the websites
CREG
Normet Schoema
Dr Sauer Terratec
BabEng VMT
Herrenknecht
CFT ITC SA Mayr HNTB CTS Cordes Bekaert Maccaferri
Brokk
Advertisement Contact
Binda Punj
Tel: +44 208 816 7011
RECENT CONTENT PUBLISHED ON TUNNELTALK
Most recent reporting
- Hong Kong-Zhuhai-Macao sea link
- Grand Paris Metro progresses with Line 16 awards
- Final TBM breakthrough for KAT2 at Koralm
- TBMs accepted for the Dubai stormwater project
- Challenging drive ahead for Bangkok Orange Metro
- Tunnel work on more Lao hydro projects
- Breakthrough ahead of schedule in China
- TBM orders for Singapore DTSS Phase 2 1
- Hong Kong-Zhuhai-Macao sea link opens
- Monitoring segment production and installation
China’s growing influence
- Hong Kong-Zhuhai-Macao sea link
- Mega slurry TBM ready for Chunfeng project
- TBMs accepted for the Dubai stormwater drives
- Success for China-Canada partnership
- The rise of Chinese manufacturers
- China acquires Aecon of Canada
- Canadian base for Chinese TBM expnasion
- TBMs complete Red Line of Tel Aviv Metro
- Two generations of tunnelling at Herrenknecht
- Eight new Lovsun’s TBMs for Metro Istanbul
News Briefs
- Helsinki envisions underground cycling route
- Malta prepares tender for fixed link to Gozo
- China completes deep undersea metro link
- TBM assembled for Louisville CSO system
- Contract awarded for Vancouver water project
- Final contract awarded for East Side Access
- Mapping the underground of Washington D.C.
- Tenders submitted for Nepalese road link
- Preparations ongoing for Melbourne’s West Gate
- Final breakthrough at Quito Metro
VIDEO REPORTING – Mega TBM operations

Twin breakthrough on the Follo Line

TBM Bertha final breakthrough

Tour of record setting TBM

Bertha’s bored alignment

Waterview project, New Zealand

Rectangular box-jacking TBM

Follo Line TBMs, Norway

Mega Sparvo TBM, Italy

UPCOMING CONFERENCES AND EXHIBITIONS