Tron Address

TRON Vanity Address Generator

tronAddress.io is a powerful web3 tool using your web browser to generate tron vanity addresses.
Enter a short prefix/suffix of your choice, and click ‘generate’ to start.

What's a tron vanity address?

A Tron vanity address is an address which part of it is chosen by yourself,Show your dignity and be different.
Examples:
TBFFiv2cBMCt7bQ8pjU4QGV7xkNHT88888
TBFFiv2cBMCt7bQ8pjU4QGV7xkNHTTTTTT
T456789UkxaH1ywLyfh1jnT3KXMdjEYHML
TBFFiv2cBMCt7bQ8pjU4QGV7xkNHT87654

How it works

Enter the prefix/suffix of your choice, and click ‘generate’ to start. Your browser will generate lots of random addresses which matches your input.
Once an address is found, you can copy the private key, or click the 'save' button to download a password-encrypted keystore file.
You can increase the number of working threads to reach higher speeds, or decrease it if you computer struggles.

Security

As explained above, everything is computed only in your browser.
Nothing ever leaves your machine, or even your browser tab. There is no database, no server-side code. Everything vanishes when you close your tab.
tronAddress.io cannot and will never store you private key.Once the web page is loaded,you can turn off the internet and continue playing,it will work seamlessly.
tronAddress.io use a cryptographically secure pseudorandom number generator (CSPRNG) to generate tron addresses.
The keystore file is encrypted with a AES-128-CTR cipher using the BKDF2-SHA256 derivation function with 65536 hashing rounds.

Performance

For some reason, the performance of tronAddress.io can vary a lot from a browser to another. Currently, Chrome provides the best results.
Using tronAddress.io on your phone or tablet will work, but don't expect to reach the speed of a good old computer.

Compatibility

Any address generated with tronAddress.io is TRC-20 compatible, which means you can use it for an ICO, an airdrop, or just to withdraw your funds from an exchange.
The keystore file is 100% compatible with TronLink.

Numbers and letters from A to F only
E.g. T****1E76C7077D51Ee699199CFef235dc
AnywhereSuffix

64

threads (recommended)
Difficulty: 1
Generated: 0addresses
50% probability:0 addresses
Speed: 0 addr/s
Start at: Waiting
Stop at: Waiting
Status: Waiting

0%

Probability