BAUMA Venue and Locator - TunnelTalk
  • Tunnelling Exhibitors
    Click on company name or stand numbers to see location on the fairground. Click PREVIEW to see company exhibition information.
      Company Hall/Booth  
    Aker Solutions/Wirth C3.209
    Atlas Copco MCT F10.1008
    BASF - MEYCO   PREVIEW C3.113
    Bekaert C1.102
    Belloli C2.512
    Bohrtec GmbH C3.315/512
    Bohrtec Vertical GmbH C3.315/512, F7.703/12
    CBE GROUP   PREVIEW C3.306A
    Ceresola C2.504A
    CIFA S.p.A. F9.905/1
    Ditch Witch B3.301/402
    Doka F8.N811
    DSI Dywidag-Systems A2.321
    FiReP International C3.513
    GeneSys Elektronik GmbH C3.315/512
    GIA industri ab   PREVIEW C2.413/510
    Global Tunnelling Experts B.V. C3.315/512
    Godwin Pumps   PREVIEW A6.406
    GÖLZ GmbH A1.425
    Grindex AB A6.115/224
    Häny C2.415
    H+E Logistik GmbH C3.315/512
    HEINZMANN C2.203/300
    Herrenknecht AG   PREVIEW C3.315/512, F7.703/12
    Herrenknecht Formwork Technology GmbH C3.315/512
    Herrenknecht Vertical GmbH C3.315/512
    Liebherr International F8.803
    LOVAT C2.409
    Maschinen- und Stahlbau Dresden (MSD) C3.315/512
    Minova International C2.508
    MTS Perforator C3.207
    NFM TECHNOLOGIES C3.118
    Normet   PREVIEW B3.225
    Palmieri C3.111
    Perforator C3.207
    Putzmeister B6.100/400
    ROBBINS C2.401
    Rowa C2.512
    Sandvik F6.605/1
    Schauenburg Tunnel-Ventilation C3.409
    SELI C3.110
    tacs C2.416
    TunnelTec   PREVIEW C3.521
    Underground Technology Services AG C3.315/512
    VMT GmbH C3.315/512
BAUMA 19-25 April, 2010 - Tunnellers on show
p2

With more than 3,000 exhibitors, spread out over more than 555,000m2 of indoor and outdoor exhibition space, finding the companies that you want to visit at BAUMA(19 -25 April), and having your visitors find you, will be no easy task. As a service to the tunnelling industry, TunnelTalk has programmed an on-line locator. Click on the names of the exhibitors on the right to locate them on the floor plan of the fairground. As an extra service, we will publish previews of what exhibitors will be presenting on their stands during the week of the construction equipment exposition. If you are in the tunnelling industry and will be exhibiting at BAUMA 2010 and we have missed you on the list, please do let us know with an e-mail to Christie@TunnelTalk.com and we will be sure to add you to our tunnelling industry specific line-up.
References
Standby for BAUMA - TunnelTalk, Jan 2010
BAUMA - Finding where you need to get to - TunnelTalk, Jan 2010
BAUMA

           

Add your comment

In case of an error submitting Feedback, copy and send the text to Feedback@TunnelTalk.com
Name :

Date :

Email :

Phone No :

   Security Image Refresh
Enter the security code :
No spaces, case-sensitive
 
 
characters