EQUIPMENT SALES
  • Used Equipment Sales and Equipment Needed

    Advertise used equipment for sale or used equipment needs to the worldwide tunnelling community.


    Notices will be posted on the Equipment Sales page for a period of four weeks per booking and will be highlighted for those four weeks on the free weekly Alert that goes to more than 7,000 signed-up Alert recipients very Thursday and on the Current opening page of TunnelTalk that is visited by more than 80,000 readers per month.


    For more details about the service and its cost-effective fee of less than US$1,000 for a four week booking, please contact:EquipmentSales@TunnelTalk.com


Equipment Sales

Tunnelling equipment available for sale

ALBATROS Engineering GmbH has the following items of tunnelling equipment on offer for used equipment sale.

To obtain further details contact stw@alba.at

Drill jumbo
Manufacturer: Atlas Copco
Type: XE3C
Built: 2007
Serial No.: AVO 07A206
Hours worked: 3,750
Boom: BUT 45
Feed: BMH 6X18
Rock drill: COP 1
Drill jumbo
Manufacturer: Atlas Copco
Built: 2009
Serial No.: AVO
Hours worked: 3,700
Boom: BUT 45
Feed: BMH
Drill: COP
Drill jumbo
Manufacturer: Atlas Copco
Type: L2C
Built: 2004
Serial No.: AVO 04A178
Hours worked: 1,451
Boom: BUT 35
Feed: BMH 6814
Rock drill: COP 1838
Drill jumbo
Manufacturer: Deilmann-Haniel
Type: BTRL2
Built: 2003
Serial No.: 832-SE2
Hours worked: 1,500
Boom: BTL 180-110
Feed: PS 386GV
Rock drill: COP 1432
Side-dump loader NEW
Manufacturer: Deilmann-Haniel
Type: L513 SO
Built: 2004
Serial No.: 01R
Hours worked: 160
Drill jumbo
Manufacturer: ATLAS COPCO
Type: WL3C
Built: 2006
Serial No.: AVO 06A296
Hours worked: 795
Boom: BUT 35
Feed: BMH 6418
Rock drill: COP 1838
Drill jumbo
Manufacturer: ATLAS COPCO
Type: L2C
Built: 2003
Serial No.: AVO 02A034
Hours worked: 3.855
Boom: BUT 35
Feed: BMH 6816
Rock drill: COP 1838
Tunnel excavator and loader
Manufacturer: Schaeff
Type: ITC 312 H3
Built: 2002
Hours worked: 1,319
Drill jumbo
Manufacturer: ATLAS COPCO
Type: L2C
Built: 2002
Serial No.: AVO 02A013
Hours worked: 3,656
Boom: BUT 35
Feed: BMH 6812
Rock drill: COP 1838
Drill jumbo
Manufacturer: ATLAS COPCO
Type: 282
Built: 2006
Serial No.: AVO 06A209
Hours worked: 1.106
Boom: BUT 28
Feed: BMH 6812
Rock drill: COP 1838
Drill jumbo
Manufacturer: ATLAS COPCO
Type: 282
Built: 2008
Serial No.: AVO 08A124
Hours worked: 739
Boom: BUT 28
Feed: BMH 6812
Rock drill: COP 1838

To obtain further details contact stw@alba.at

     

Add your comment

Name

Date

Subject