COMPANY NEWS

Controllable lighting for underpasses 01 Nov 2018

Nyx Hemera News Release
Diagram of TLACS-U workings
Diagram of TLACS-U workings

To increase safety and provide better lighting conditions in tunnels the Tunnel Lighting Adressable Control System (TLACS) was developed by Nyx Hemera. Now a new version of the system is being introduced for underpasses and short tunnels in North America and Europe.

The new version of this adaptive lighting control system for tunnels has been developed to help operators allow real time dimming and monitoring.

Named TLACS-U, the new system will allow operators to control the lighting, increasing safety and comfort, and increase energy savings and optimum maintenance.

The TLACS-U includes a UDE (Underpass Dimming Enclosure), a pre-configured plug and play intelligent controller packaged in a rugged cabinet for short tunnel applications and underpasses. This replaces the previous LCC used in longer tunnels and can be installed by any electrical contractor. TLACS-U is compatible with LCAM and ILCAM sensors and the latest power line local controller, the LPC 480.

TLACS-U in operation
TLACS-U in operation

The new version is available in a power line version that communicates over the underpass power distribution or lighting network or as a wired version.

“Operators want to be able to control LED luminaires in underpasses and short tunnels and the new TLACS-U is pre-configured, easy to operate and commission. We are pleased to provide a solution adapted to the operators needs in the era of smart cities’” said Pierre Longtin, President of Nyx Hemera Technologies.

References

           

Add your comment

Thank you for taking the time to share your thoughts and comments. You share in the wider tunnelling community, so please keep your comments smart and civil. Don't attack other readers personally, and keep your language professional.
In case of an error submitting Feedback, copy and send the text to Feedback@TunnelTalk.com
Name :


Date :

Email :


Phone No :

   Security Image Refresh
Enter the security code :
No spaces, case-sensitive